HAMAT Group services

Dewatering

Is water accumulating in the excavation, or will foundation works extend below the groundwater level?

What HAMAT provides

The agreed works may include system setup, operation, and monitoring of levels and discharge during construction. The team coordinates shutdown and removal with the supervising team in line with project progress and stability requirements.

How the work proceeds

We install and operate the agreed system, monitor water levels and coordinate shutdown with the project team.

What you receive

The agreed scope may include the operation and discharge plan and monitoring records.

Service limits

Groundwater drawdown can affect nearby ground and structures. The design and monitoring plan determine safe operating and shutdown conditions.

What to share with your request

  • Geotechnical report, current groundwater level, excavation depth and target levels
  • Excavation and foundation programme and expected pumping period
  • Available discharge route, surrounding constraints, and requirements for monitoring water levels and adjacent structures

Start with your site

Tell us about your site and the work you need

Review the details of your request before opening WhatsApp.

Discuss your project’s dewatering and discharge scope