What HAMAT provides
The agreed works may include system setup, operation, and monitoring of levels and discharge during construction. The team coordinates shutdown and removal with the supervising team in line with project progress and stability requirements.
How the work proceeds
We install and operate the agreed system, monitor water levels and coordinate shutdown with the project team.
What you receive
The agreed scope may include the operation and discharge plan and monitoring records.
Service limits
Groundwater drawdown can affect nearby ground and structures. The design and monitoring plan determine safe operating and shutdown conditions.
What to share with your request
- Geotechnical report, current groundwater level, excavation depth and target levels
- Excavation and foundation programme and expected pumping period
- Available discharge route, surrounding constraints, and requirements for monitoring water levels and adjacent structures