HAMAT Group services

Concrete Piles

Does your foundation design require transferring loads to deeper strata?

Detail of piling equipment on a work site
From HAMAT’s field work

What HAMAT provides

We review the investigation and pile drawings before coordinating pile layout, drilling, reinforcement and concreting to the approved method.

How the work proceeds

We set out the positions, carry out the agreed construction sequence and coordinate the specified integrity or load tests.

What you receive

The agreed scope may include a record for each pile, an as-built layout and specified test reports.

Service limits

Pile depth, diameter and reinforcement depend on the approved design, ground conditions and loads.

What to share with your request

  • Geotechnical report, groundwater information and approved foundation drawings
  • Pile schedule, design loads, specifications, and testing and supervision requirements
  • Equipment access, enabling works and required construction dates

Start with your site

Tell us about your site and the work you need

Review the details of your request before opening WhatsApp.

Request a piling drawings and proposal review